Realm
South Australia
Commercial, Hospitality & Retail
81 Mulgoa Road, Penrith NSW
2023
Turner Studio
Richard Crookes Constructions
Changing from curtain wall to window-wall partway through design development meant re-planning the installation method to work fully behind scaffold, which ultimately saved significant time on programme. Bronze glass selections added complexity to procurement, and maintaining a consistent colourway across the spandrel zones was essential to a uniform external appearance. With every panel on the facetted façade carrying a different angle, and a freestanding podium standing over nine metres tall without steel support, the podium system was fully fabricated off site to keep the build moving quickly.
Our strategy was to commit early to the window-wall switch once its programme and cost benefits were clear, restructuring the installation sequence around full delivery behind scaffold. We managed bronze glass procurement and spandrel colourway consistency as a single coordinated exercise, so the façade would read uniformly despite the change in make-up. For the freestanding podium, standing over nine metres without steel, we fabricated the deep-set system fully off site, reducing the amount of complex work required at height on the finished building.
The result was a façade delivered faster than originally programmed, with a facetted, uniquely angled envelope and a freestanding podium built for speed without compromising strength.